Files
gwutilz/gwencoder/docs/phases/PHASE5_TESTING_PLAN.md
2026-03-23 15:48:34 -07:00

2.1 KiB
Executable File

Phase 5: Testing & Validation Plan

Overview

Phase 5 focuses on comprehensive testing of all implemented features with various flag combinations, logging performance metrics, and validating functionality.

Test Objectives

  1. Verify all features work correctly
  2. Test various flag combinations
  3. Measure performance (time, file size, speed)
  4. Document results for review
  5. Identify any issues or optimizations needed

Test File

  • File: testvid.webm
  • Size: ~64.4 MB
  • Resolution: 1200x675
  • Codec: VP8 video

Test Suite

Quick Test (3 tests)

Fast validation of core functionality:

  1. Default settings (--fast)
  2. AV1 advanced options (--fast --av1-preset 8 --av1-crf 30)
  3. Audio options (--fast --audio-quality balanced --audio-stereo)

Comprehensive Test (10 tests)

Full feature validation:

  1. Default Fast - Baseline test with default settings
  2. Fast AV1 Advanced - Custom preset and CRF
  3. Fast Audio Options - Audio quality and channel options
  4. Web Mode - Different container and CRF
  5. Web Maxrate - Bitrate capping
  6. Tiny Mode - Maximum compression
  7. HQ Mode - High quality settings
  8. Fast Extract Subs - Subtitle extraction
  9. Fast Force Transcode - Force transcoding
  10. Fast Full Audio - Complete audio features

Metrics Collected

For each test:

  • Duration: Encoding time in seconds
  • File Size: Output file size in MB
  • Compression: Compression ratio (%)
  • Speed: Encoding speed (fps if available)
  • Status: Success/Failure
  • Output File: Generated file path

Test Scripts

  • phase5_test.sh - Comprehensive test suite (10 tests)
  • phase5_quick_test.sh - Quick validation (3 tests)

Results

Results are logged to:

  • phase5_test_results.log - CSV format log
  • PHASE5_TEST_RESULTS.md - Markdown results table
  • phase5_test_outputs/ - Individual test logs and output files

Status

  • Test scripts created
  • Tests running
  • Results collection in progress

Next Steps

  1. Run comprehensive test suite
  2. Analyze results
  3. Document findings
  4. Identify optimizations
  5. Create final summary